Skip to main content

Technical Requirements Checklist

Purpose

This checklist ensures system compatibility and validates technical requirements for Phoenix Rooivalk deployment. Use this during technical validation to assess infrastructure, integration, and operational requirements.


Section 1: Site Infrastructure Assessment

Physical Environment

  • Site Survey Completed

    • Coverage area mapped and documented
    • Terrain analysis completed
    • Environmental conditions assessed
    • Access routes identified
    • Power sources located
  • Environmental Conditions

    • Temperature range: -40°C to +70°C
    • Humidity: 0-95% non-condensing
    • Altitude: Sea level to 5,000m
    • Weather: All-weather operation capability
    • Dust/sand protection required
    • Corrosive environment protection

Power Requirements

  • Base System Power

    • 500W typical power consumption available
    • 1,000W peak load capacity
    • 4-hour battery backup capability
    • Solar integration option (if required)
    • UPS system for critical operations
  • Power Distribution

    • Dedicated circuits for Phoenix Rooivalk systems
    • Ground fault protection
    • Emergency power backup
    • Power monitoring and alerting

Network Infrastructure

  • Connectivity Requirements

    • High-speed internet (fiber preferred)
    • Redundant connectivity options
    • Satellite communication backup
    • Cellular network coverage
    • Mesh networking capability
  • Network Security

    • Firewall configuration
    • VPN access for remote monitoring
    • Network segmentation
    • Intrusion detection systems
    • Secure communication protocols

Section 2: Hardware Compatibility

Computing Requirements

  • Edge Computing Platform

    • NVIDIA Jetson AGX Orin compatibility
    • 275 TOPS AI performance capability
    • 32GB LPDDR5 memory minimum
    • 64GB eMMC storage minimum
    • CUDA cores and Tensor cores support
  • Sensor Integration

    • RF spectrum analysis capability
    • Radar detection system integration
    • EO/IR camera support
    • Acoustic sensor integration
    • LiDAR system compatibility

Drone Platform Requirements

  • VTOL Mothership Platform

    • Autonomous takeoff/landing capability
    • 2-4 hour flight endurance
    • Swarm coordination capability
    • Multi-sensor payload integration
    • Weather-resistant design
  • Interceptor Drones

    • High-speed threat neutralization
    • Non-destructive and kinetic options
    • Autonomous targeting capability
    • Evidence collection systems
    • Rapid deployment capability

Section 3: Software Requirements

Operating System

  • RedHawk Linux RTOS
    • Real-time performance capability
    • Deterministic task scheduling
    • Low latency operation
    • Security compliance (SELinux)
    • Secure boot capability

AI/ML Capabilities

  • YOLOv9 Integration
    • 95.7% mAP object detection accuracy
    • Real-time processing capability
    • Multi-sensor fusion support
    • Edge computing optimization
    • Model update capability

Blockchain Integration

  • Solana Primary Chain

    • 65,000+ TPS capability
    • Sub-second finality
    • Low transaction costs
    • Proof of History consensus
    • Horizontal scaling support
  • EtherLink Secondary Chain

    • Cross-chain bridge capability
    • Multi-jurisdiction compliance
    • Backup evidence storage
    • Enterprise system integration
    • Redundancy and failover

Section 4: Integration Requirements

Existing Systems Integration

  • Security Systems

    • CCTV camera integration
    • Access control system integration
    • Perimeter sensor integration
    • Command and control center integration
    • Alert and notification systems
  • Communication Systems

    • Radio communication integration
    • Satellite communication support
    • Cellular network integration
    • Mesh networking capability
    • Emergency communication systems

Data Integration

  • Data Storage

    • Local storage capability
    • Cloud storage integration
    • Blockchain evidence storage
    • Data retention policies
    • Backup and recovery systems
  • Data Analytics

    • Real-time monitoring dashboards
    • Historical data analysis
    • Threat intelligence integration
    • Performance metrics tracking
    • Reporting and alerting

Section 5: Performance Requirements

Response Time Requirements

  • Detection Latency
    • <50ms threat detection
    • <100ms initial classification
    • <200ms end-to-end response
    • Real-time processing capability
    • Concurrent threat handling

Accuracy Requirements

  • Detection Accuracy
    • 95%+ detection accuracy
    • <2-5% false positive rate
    • Multi-sensor fusion capability
    • Weather-independent operation
    • Low-light condition operation

Autonomy Requirements

  • SAE Level 4 Autonomy
    • Complete edge autonomy
    • No network dependency
    • Autonomous decision making
    • Human oversight capability
    • Override and intervention options

Section 6: Security and Compliance

Security Requirements

  • Cybersecurity

    • Zero-trust security architecture
    • End-to-end encryption
    • Secure communication protocols
    • Access control and authentication
    • Intrusion detection and prevention
  • Physical Security

    • Tamper-resistant hardware
    • Secure storage facilities
    • Access control systems
    • Environmental monitoring
    • Backup and redundancy

Compliance Requirements

  • ITAR Compliance

    • USML Category VIII (Aircraft)
    • USML Category XI (Military Electronics)
    • DDTC registration
    • Technical data controls
    • Export control compliance
  • DoD Requirements

    • DoD Directive 3000.09 compliance
    • Autonomous weapons policy
    • Human judgment requirements
    • Authorization chain compliance
    • Audit trail requirements

Section 7: Operational Requirements

Deployment Requirements

  • Installation

    • Site preparation completed
    • Equipment installation planned
    • Testing and validation scheduled
    • Training program planned
    • Go-live support arranged
  • Maintenance

    • Preventive maintenance schedule
    • Spare parts inventory
    • Technical support availability
    • Remote monitoring capability
    • Emergency response procedures

Training Requirements

  • User Training

    • System operation training
    • Emergency procedures training
    • Maintenance training
    • Security awareness training
    • Certification requirements
  • Administrator Training

    • System administration
    • Configuration management
    • Troubleshooting procedures
    • Security management
    • Performance optimization

Section 8: Risk Assessment

Technical Risks

  • System Integration Risks

    • Legacy system compatibility
    • Data migration challenges
    • Performance bottlenecks
    • Security vulnerabilities
    • Scalability limitations
  • Operational Risks

    • Single points of failure
    • Maintenance dependencies
    • Environmental factors
    • Human error potential
    • External threats

Mitigation Strategies

  • Risk Mitigation
    • Redundancy and failover systems
    • Backup and recovery procedures
    • Security monitoring and alerting
    • Regular testing and validation
    • Continuous improvement processes

Section 9: Validation and Testing

Pre-Deployment Testing

  • System Testing

    • Functional testing completed
    • Performance testing completed
    • Security testing completed
    • Integration testing completed
    • User acceptance testing completed
  • Site Testing

    • Environmental testing
    • Network connectivity testing
    • Power system testing
    • Communication testing
    • Emergency procedure testing

Post-Deployment Validation

  • Go-Live Validation
    • System performance monitoring
    • User training validation
    • Process documentation
    • Issue resolution procedures
    • Success metrics tracking

Section 10: Sign-off and Approval

Technical Approval

  • Technical Team Sign-off
    • System architecture approved
    • Integration requirements met
    • Performance requirements validated
    • Security requirements satisfied
    • Compliance requirements met

Business Approval

  • Business Team Sign-off
    • Budget approval obtained
    • Timeline approval obtained
    • Resource allocation confirmed
    • Risk acceptance documented
    • Success criteria defined

Executive Approval

  • Executive Sign-off
    • Strategic alignment confirmed
    • Investment approval obtained
    • Risk tolerance confirmed
    • Success metrics approved
    • Go/no-go decision made

Checklist Summary

Critical Requirements (Must Have)

  • Site infrastructure meets requirements
  • Hardware compatibility confirmed
  • Software requirements satisfied
  • Integration requirements met
  • Performance requirements validated
  • Security requirements satisfied
  • Compliance requirements met

Important Requirements (Should Have)

  • Training requirements planned
  • Maintenance procedures defined
  • Risk mitigation strategies in place
  • Testing and validation planned
  • Success metrics defined

Nice to Have Requirements (Could Have)

  • Advanced features requested
  • Future expansion planned
  • Additional integrations desired
  • Enhanced capabilities requested

Overall Assessment: [ ] APPROVED [ ] CONDITIONAL APPROVAL [ ] NOT APPROVED

Next Steps: ****************_****************

Approval Date: ****_**** Approved By: ****_****


This checklist ensures comprehensive technical validation for Phoenix Rooivalk deployment. All critical requirements must be met before proceeding with implementation.